Solar power plant “SE Monte-Mont H”
- POWER: 297,00 kWp
- OUTPUT POWER: 240 kW
- ANNUAL PRODUCTION: 264 MWh
- INVESTOR: S.E.G. Energija d.o.o.
- LOCATION: Osijek, ul. Borova 6 k.č.br. 10774/45 k.o. Osijek

Solar power plant “SE Monte-Mont VP”
- POWER: 99,00 kWp
- OUTPUT POWER: 70 kW
- ANNUAL PRODUCTION: 108 MWh
- Investor: S.E.G. Energija d.o.o.
- Two solar power plants
- Power plant for the sale of electricity with a power of 240.00 kW
- Power plant for own needs with a power of 70.00 kW
- Location: Ulica Borova 6, Osijek
The power plants were put into permanent operation.